Case of project

  • The building contains a basement of 3 floors under the ground level by 15 Meters.
  • The underground water level is 1 Meter.

Problem that OSISCO solved

  • Water leaks in the construction joints, the concrete ground, the kicker between wall and floor, and walls.

Solution by OSISCO

  • A Re-injectable hoses system was applied to the Construction Joints during the construction process.
  • TPH Rubbertite Acrylic Gel was injected and applied in the hoses to stop the leakage in the joints, walls, and kickers.
  • Rubbertite has a lifetime of 120 years, strong adhesion to concrete, handle pressure up to 7 bars, and is an Eco-friendly material.
التغذية الراجعة

ما يقوله عملاؤنا

Lorem ips ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua.
في vero eos eos et accusam et justo dolores du du dolores et ea rebum.
Stet clita clita kasd guasd gubergren، لا بحر takimata sanctus est Lorem ipsum dolor sit amet.
Lorem ipsum ipsum