Case of project
- The building contains a basement of 3 floors under the ground level by 15 Meters.
- The underground water level is 1 Meter.
Problem that OSISCO solved
- Water leaks in the construction joints, the concrete ground, the kicker between wall and floor, and walls.
Solution by OSISCO
- A Re-injectable hoses system was applied to the Construction Joints during the construction process.
- TPH Rubbertite Acrylic Gel was injected and applied in the hoses to stop the leakage in the joints, walls, and kickers.
- Rubbertite has a lifetime of 120 years, strong adhesion to concrete, handle pressure up to 7 bars, and is an Eco-friendly material.