The project includes engineering, design, fabrication, site testing, and commissioning to connect the main 3 substations at the New Administrative Capita with a total route length 17 KM
Problem
Water Leakage from the expansion joints & Kicker due to Bad Waterproofing and break of water pipe.
Joint Width=5cm.
Solution
TPH Variotite was applied in the joints to make a permanent waterproofing solution.
Variotite has a setting time of 10 secs, elongation up to 750%, strong Adhesion to concrete.
Rubbertite was applied to the kickers.
PUR-O-Stop 1 Component Flexible polyurethane foam was applied to reduce water flow.
Both Materials used are Eco-friendly & permanent Waterproofing Materials.