Elsewedy Electric Tunnel (underground Tunnel) – New Capital

Project Overview

Case

  • The project includes engineering, design, fabrication, site testing, and commissioning to connect the main 3 substations at the New Administrative Capita with a total route length 17 KM

Problem

  • Water Leakage from the expansion joints & Kicker due to Bad Waterproofing and break of water pipe.
  • Joint Width=5cm.

Solution

  • TPH Variotite was applied in the joints to make a permanent waterproofing solution.
  • Variotite has a setting time of 10 secs, elongation up to 750%, strong Adhesion to concrete.
  • Rubbertite was applied to the kickers.
  • PUR-O-Stop 1 Component Flexible polyurethane foam was applied to reduce water flow.
  • Both Materials used are Eco-friendly & permanent Waterproofing Materials.

Similar Project?

Our engineers respond within 24 hours. Free site assessment included.

Request Assessment →